The Green Lake County Highway Commission is responsible for the year-round maintenance of 229 miles of County Trunk Highways and 70 miles of State Highways.
The Highway Commissioner directs the department, which consists of 23 employees. Operations of the department are quartered in two locations: the main facility is located in the city of Green Lake with the second facility located in the town of Manchester.
Staff Directory
Derek Mashuda – Highway Commissioner
920-294-4060
Aaron Wagner – Highway Superintendent
920-294-4065
Jason Franke – Highway Superintendent
920-294-4063
Becky Pence – Administrative Assistant
920-294-4060
Implement of Husbandry (IoH) Permits
For Information visit: www.wisconsindot.gov ~ Agricultural equipment and vehicles
State E – opt in Yes
Green Lake County E – opt in Yes
Town of Berlin E – opt in Yes
Brenda Murkley, Clerk 920-361-4717 x101
Town of Brooklyn B – total opt out No
Town of Green Lake B – total opt out No
Town of Kingston E – opt in Yes
Allan Hoffman, Chairman 920-394-3293
Town of Mackford E – opt in Yes
Sandy James, Clerk 920-398-2693
Town of Manchester B – total opt out No
Town of Marquette B – total opt out No
Town of Princeton F – abides by Act 377 Yes
Allan Weckwerth, Chairman 920-361-2976
Town of Seneca E – opt in Yes
Joe Formiller, Chairman 920-361-2976
Town of St. Marie E – opt in Yes
Jim Karlovich, Chairman 920-295-3432
Highway Department Projects
Current projects in Green Lake County that are either in progress or scheduled for 2024.
Last Updated on October 14, 2024
County Highway J:
Location: City of Princeton – South 49
Distance: 9.5 miles
Impact: None
Status: Complete
County Highway T:
Location: Farmer Street – Bend Road
Distance: 2 Miles
Impact: Road will be closed to through traffic 6/10. All locals within the construction zone will have access to their homes.
Status: Base layer, pulverization. Paving starting 10/28
County Highway D:
Location: Highway 23 – Highway 73
Distance: 5.17 Miles
Impact: None
Status: Completed and Open
2025 County Highway A:
Location: County Highway A – County Highway I
Distance: 4 Miles
Impact: None
Status: Design
2026 County Highway A:
Location: County Highway V – County Highway AA
Distance: 1.5 Mile
Impact: None
Status: Design
6536-03-04_Project Location Map
6536-03-04_PIM Handout Fact Sheet
Copy Link
Permit Fees
A non-refundable charge for administration purposes shall be assessed by the County Highway Department based upon the following fee schedule as follows for anyone seeking the following permits:
A. Utility Permit – Utilities within County Trunk Highway Right-Of-Way:
(1) Off Pavement Utility Fee $50.00
(2) Borings $50.00 each
(3) Open Cut (cut through pavement) $325.00 each
(4) After the Fact Permit $75.00
B. Overweight-Size Permit – Transportation of loads of Overweight and/or Oversize on a County Trunk Highway:
(1) Overweight $75.00
(2) Oversize $50.00
(3) After the Fact Permit $75.00
C. Driveway Permit – Excavation, Fill or to Install a Culvert Pipe on a County Trunk Highway:
(1) Driveway New Access $150.00
(2) Driveway Alteration $50.00
(3) After the Fact Permit $250.00
D. Multi Trip Permit – Transportation of loads in excess of posted weight on a County Trunk Highway:
(1) Single-Trip $50.00 each
(2) Multi-Trip $150.00 max
Seasonal Weight Restrictions
2023 Seasonal Weight Restrictions HAVE BEEN LIFTED 04/03/2023
Highway Department Pursuant to Wisconsin Statutes 349.16, Green Lake County highway season weight restrictions will become effective 03/13/2023 on County Trunk Highways where posted. Weight will be limited to 4 tons per axle, 10 tons gross.
A permit is required to haul on a posted road, and will be issued on a case by case basis. See Multi-Trip Permit and Terms and Conditions attached. You may contact the Highway Department at 920-294-4060.
Green Lake County will be enforcing the posted seasonal weight limits and penalties may be imposed under §348.21 Wis. Statutes for violations.
This notice does not include town roads. Townships will need to be contacted directly for the status of their seasonal weight restrictions.
Green Lake County Seasonal Weight Restrictions
CTH F (From the intersection of CTH E & CTH F by the Fairborn Church to the Waushara County Line)
CTH D North (From Princeton to CTH F)
CTH DD
CTH PP
CTH D (Between STH 23 & STH 73)
CTH Y (Between CTH Y & STH 73)
CTH J (STH 49 to Princeton)
CTH J (STH 73 to Marquette County)
CTH P
CTH CC
CTH A (From STH 49 to STH 23)
CTH AA (From STH 49 to CTH A)
CTH AA (From STH 49 to CTH F)
CTH B (Between STH 73 & CTH N)
CTH N (Between CTH K & STH 44)
CTH Q (From CTH AW to CTH S east)
CTH JJ
CTH S (RR Spur & CTH Q)
CTH S (From STH 73 to STH 44)
CTH H (Between STH 44 & STH 73)
CTH I (Between STH 44 & CTH A)
CTH I (Between CTH H & STH 73)
CTH B (From STH 73 to CTH H)
CTH BB
CTH KK
CTH EE
CTH FF
CTH FFF
CTH II
CTH HH
CTH H (From Puckaway Road to STH 44)
CTH M
CTH GG
CTH O (From Markesan to CTH AW)
CTH W
CTH U (Between CTH I & STH 73)
CTH S (Between Gate Road & CTH X)
CTH X (From STH 44 to CTH Q)
6 Year Improvement Plan
Improvement plan is subject to change do to funding availability and roadway conditions. This plan is for reference only and not guaranteed.
Copy Link2023 Current Bids
Current bid Solicitations:
None
Copy Link